| DELIVERABLE EXECUTIVE SUMMARY |
| D3101 First trial integration report | ||
| The present document is the first major deliverable provided by WP 3.1 of the AQUILA proj-ect. It describes in detail the procedures that took place for the verification of the correct op-eration of the AQUILA Resource Control Layer and Measurement Tools. It also contains in-structions for the installation of the working prototypes in other trial sites as well as instruc-tions for their use during the trials. Finally, the results of the integration are presented. | ||